2019 Bad Oldesloe - ISO 14001, ISO 9001 & OHSAS 18001
Closed Period
Aspen is in a closed period from 1 January until the publication of our interim results on the JSE SENS platform scheduled to be released on 1 March 2023.
The live presentation will take place in Cape Town at 08h30 on 2 March 2023.