2020 Notre Dame de Bondeville – ISO 14001

2020 FCC – ISO 45001

2020 FCC – ISO 14000

2020 Dandenong – OHSAS 18001

2020 Dandenong – ISO 14001

2020 Bad Oldesloe – OHSAS 50001

2020 Bad Oldesloe – ISO 45001

2020 Bad Oldesloe – ISO 14001

Closed Period

Aspen is in a closed period from 1 January until the publication of our interim results on the JSE SENS platform scheduled to be released on 1 March 2023.

The live presentation will take place in Cape Town at 08h30 on 2 March 2023.